1.
Jain M, Chauhan D. Transient Analysis of Flexible Manufacturing Cell with Loading/Unloading Robot and Two Unreliable Machines. ijmcr [Internet]. 22Mar.2014 [cited 2May2024];2(03):359-70. Available from: http://ijmcr.in/index.php/ijmcr/article/view/112