Keywords:-
Article Content:-
Abstract
The performance of a production system depends on the breakdown-free operation of equipment an processes. Maintenance and quality control play an important role in achieving this goal. In addition to deteriorating with time, equipment may experience a quality shift (i.e. process moves to out-of-control
state), which is characterized by a higher rejection rate and a higher tendency to fail. This paper develops an integrated model for joint optimization of preventive maintenance interval and control parameters incorporating the Taguchi loss function. We consider two types of maintenance policies: minimal corrective maintenance that maintains the state of the equipment without affecting the age and imperfect preventive maintenance that upgrades the equipment in between „as good as new‟ and „as bad as old‟ condition. The proposed model enables the determination of the optimal value of each of the four decision variables, i.e. sample size (n), sample frequency (h), control limit coefficient (k), and preventive maintenance interval ( ) that minimizes the expected total cost of the integration per unit time. A numerical example is presented to demonstrate the effect of the cost parameters on the joint economic design of preventive maintenance and process quality control policy. The sensitivity of the various parameters is also examined.
References:-
References
Pandey, D., Kulkarni, 2010. A model for optimal maintenance interval incorporating the cost of
rejections in manufacturing International Journal of Advanced Operations Management
Lad, B.K. and Kulkarni, M.S., 2008. Integrated reliability and optimal maintenance schedule design:
a life cycle cost based approach. International Journal of Product Life Cycle Management, 3 (1), 78–
Black, J. and Mejabi, O., 1995. Simulation of complex manufacturing equipment reliability using
object oriented methods. Reliability Engineering and System Safety, 48 (1), 11–18.
Ben-Daya, M. (1999). Quality and reliability Improvement in Multistage Production Systems.
Proceedings of The 5th ISSAT International Conference on Reliability and Quality Design, pp. 229-
Bai, D.C. and Lee, K.T., 1998. An economic design of variable sampling interval X-control charts.
International Journal of Production Economics, 54, 57–64.
Yeung, T.G., Cassady, C.R., and Schneider, K., 2008. Simultaneous optimization of X-control chart
and age-based preventive maintenance policies under an economic objective. IIE Transactions, 40,
–159.
Lorenzen, T. J., & Vance, L. C. (1986). The economic design of control charts: A unified approach.
Techno metrics, 28(1), 3–10. 8. Kijima, M., 1989. Some results for repairable systems with general repair. Journal of Applied
Probability, 26, 89–102.