Abstract
Project delivery within the established time line and project cost is one of the persistent issues in current project management practices. This work therefore aimed at assessing the appropriateness of Project Evaluation Review Technique and Critical Path Method in project management with a case study of a UNN lecture hall construction. Consequently, the research establishes the impact of these quantitative operations research tools on the efficient project management. Both of these project management techniques were explained and used in relation to the data that was obtained from the lecture hall construction project manager, concerning the project activities and the time taken for each of these activities. As indicated by the findings of this study, both the methods were posited to achieve success in project management where by relationship and connectivity of the activities that define a project life cycle persist as the key issues. As such, it was suggested that in view of the project critical activities determined by the CPM and/or PERT analyses, more resources and attention should be directed towards effective management of such activities to avoid the occasion of project delay as well as ensure the successful completion of projects.
References:-
References
Adeboye, O. A., & Oluwatobi, S. A. (2021). Enhancing construction project management with building information modeling: Case Study of Nigerian infrastructure projects. Journal of Construction Engineering and Management, 147(1), 04020099.
Adedeji, A. T., & Ayo, C. K. (2018). Political instability and construction project performancein Nigeria. Journal of Building Performance, 9(1), 1-17.
Aliyu, M. (2012). Application of critical path method (CPM) in building construction projects: A case study of Federal University of Technology, Yola. International Journal of Engineering Research and Applications, 2(3), 1374-1381.
Bagshaw, K. B. (2011). Quantitative analysis for business decisions. Port Harcourt: Nybraide Enterprises, Nigeria.
Bagshaw, K. (2021). Quantitative decision-making in project management: A comparativeanalysis of PERT and CPM. International Journal of Project Management, 39(5), 829-840.
Danfulani, A. (2023). Application of critical path method (CPM) in scheduling buildingconstruction projects: A case study of Mosul Estate. Journal of Construction Engineering and Management, 149(2), 04021107.
Eshofonie, A. A. (2020). Labour shortage in the construction industry in Nigeria: Implicationsfor sustainable development. Journal of Sustainable Development, 13(3), 143-158.
Hugo, S. (2020). Optimization of housing construction projects using PERT and CPM:A case study. Journal of Construction Engineering and Management, 146(6), 04020062.
Ibem, E. O. (2019). Stakeholder Engagement in Sustainable Construction: A Case Studyof Infrastructure Projects in Nigeria. Journal of Sustainable Development, 12(4), 89-104
Lermen, H. (2016). Optimization of production projects using PERT/CPM techniques: A case study of horizontal laminator. International Journal of Production Research, 54(19), 5743-5756.
Ololade, I. A., & Adedeji, A. T. (2017). Environmental challenges and sustainable construction practices in Nigeria. Journal of Sustainable Development, 10(1), 34-49.
Oluwatobi, S. A. (2019). Corruption, bureaucracy and public expenditure onInfrastructure in Nigeria. Journal of Development Policy, 14(2), 87-102.
Olusola, K. O., & Ojebode, A. S. (2018). Ethical leadership in the Nigerian construction industry: Challenges and Opportunities. Journal of Construction Engineering and Management, 144(5), 04018035.
Oyeyipo, O. O., & Adewale, A. O. (2020). Currency fluctuations and construction project financing in Nigeria. International Journal of Construction Management, 20(4), 308-322.
Surayya, S., & Hendra, H. (2022). Optimizing shipbuilding project schedules using PERT and CPM: A case study. Journal of Ship Production and Design, 38(1), 28-38.
Wallace, A. (2015). Trade-off analysis between cost and duration in building construction projects using PERT and CPM. Construction Management and Economics, 33(1), 45-60.